TAMA 38 and Pinui-Binui Urban Renewal in Israel in 2026: The Complete Guide for Apartment Owners
TAMA 38 expired in May 2026. Owners' options now: replacement plans, the Shaked alternative, pinui-binui, majorities, holdouts and pre-signing checks.
This story was written with AI assistance, based on the sources linked at the end, and fact-checked. Responsible editor: אריאל סיבקוב. Found an error? Tell us.
Translated from the Hebrew original with the assistance of AI. Read the Hebrew original
In short: TAMA 38 expired for good on May 18, 2026, and since then no new permit applications can be filed under it. Owners of apartments in older Israeli buildings are left with three tracks: a municipal replacement plan (if approved), the Shaked alternative (barely used), and pinui-binui (literally "evacuation and construction" – demolishing a complex and rebuilding it denser). This guide explains what exists in your city, what majority is needed, what happens with a holdout tenant, and what you must check before signing.
Contents
- What happened to TAMA 38
- The three remaining tracks
- What majority is required
- Holdout tenants: what the law says
- Special protections for owners
- Realistic timelines
- What to check before signing
- What to expect in legislation
- Glossary
- Frequently asked questions
What happened to TAMA 38
TAMA 38 was a national outline plan for strengthening buildings against earthquakes. It allowed adding floors, or demolishing and rebuilding a single building, without waiting for a municipal plan. Its original expiry date was set for August 2024, but extensions were granted: authorities that asked to keep using it received an extension until May 2026 or until a replacement plan took effect, whichever came first. On May 18, 2026 it expired for good.
Before the deadline there was a rush to file. According to Jerusalem's city engineer, close to 400 plans were filed in the city under the old track in the last two months before TAMA 38 expired. Those who filed before the deadline generally continue under the old rules, but it depends on the stage of the application – check with the local planning committee.
The three remaining tracks
1. A municipal replacement plan ("building renewal"). According to the Israel Planning Administration, as reported by the Real Estate Center (Merkaz HaNadlan) in June 2026, a replacement plan had been approved in eight planning areas: Ramla, Yavne, Ra'anana, Hadera, Kfar Saba, Petah Tikva, Be'er Sheva and Givatayim. In Ashdod and Nahariya a plan had been approved but was not yet in force at that time. Large cities such as Jerusalem, Haifa, Ramat Gan, Rishon LeZion, Bnei Brak, Bat Yam and Herzliya had no approved replacement plan then, and in Tel Aviv the track applied only in Districts 3 and 4. In Ra'anana, for example, close to 90 information and permit requests were filed or advanced under the new plan within less than a year.
What to do: check the local planning committee's website, or contact the urban renewal department, and ask one question: "Which plan applies to my plot today?" The situation changes from month to month.
2. The Shaked alternative. A track set in Amendment 139 to the Planning and Building Law and approved in 2022, together with the decision to let TAMA 38 expire. The permit and the plan are advanced in parallel, and the authority collects a betterment levy. In practice, at a panel in November 2026, a former chair of the Tel Aviv district planning committee said he did not know of even one permit issued under it. In other words: it exists on paper, but is rare on the ground.
3. Pinui-binui. Demolishing a building or complex and rebuilding at much higher density under a detailed plan. This is the big, long track. Under the Arrangements Law amendments that took effect on January 1, 2022, a pinui-binui complex requires at least 24 housing units, and the number of units after the plan must be at least double the existing number or 70 units, whichever is higher.
What majority is required
Pinui-binui: Since January 1, 2022, the majority needed to sue a holdout tenant dropped from 80% to 66% of apartment owners, and the requirement to hold 75% of the common property was removed. In a complex of several buildings, 60% is required in each building. An owner holding more than 30% of the apartments in a building of six or more units is counted under a special formula (30% plus one third of the excess).
TAMA 38 (strengthening and additions): According to the Real Estate Center, a majority of 66% of owners is required. For projects filed before the expiry, and in the replacement tracks, the required majority depends on the law and plan actually applying – check with a lawyer.
Important: only a signature on a binding agreement counts. "Support" at a meeting or a signature on a letter of intent usually does not.
Holdout tenants: what the law says
Under TAMA 38: once the majority is reached, you can apply to the Superintendent of Condominiums. The Superintendent may authorize the tenants' representative to sign in place of the holdout – only if the refusal is unreasonable.
Under pinui-binui: under Amendment 6 to the Evacuation and Construction (Compensation) Law of 2018, action can be taken against a holdout as early as after approval of the detailed plan. The court may rule that the holdout is liable in tort toward the other owners, and may even order the appointment of an officer to sign on their behalf.
When is a refusal considered reasonable? According to the Real Estate Center's summary of case law: when the project is not economically feasible, when no alternative housing or adequate security was offered, when the compensation is lower than that of the other tenants, when there is a disability without a suitable solution, or when there are legitimate concerns about the developer's financial strength.
Special protections for owners
- Elderly owners: the Arrangements Law lowered the definition of "elderly" for this purpose from age 75 to 70. In pinui-binui, an elderly owner who was not offered the alternatives specified in the law may refuse, and the refusal will be considered reasonable. Under TAMA 38, the developer must offer alternative housing during construction to an owner aged 80 or older.
- Right to cancel under TAMA 38: an owner may cancel the agreement if the developer did not sign with at least 50% of owners within 18 months of the first agreement, did not reach the required majority within 3 years, or did not file a permit application within 3 years and 6 months.
- Information: the developer must convene the owners, present the main terms of the offer and give every signatory the transaction documents.
Realistic timelines
The Governmental Authority for Urban Renewal's 2025 report shows a large gap between planning and execution: 186 detailed pinui-binui plans were approved in 2025, but building permits for pinui-binui fell to 13,066 apartments, from 15,436 in 2024. The State Comptroller found a complex in Ra'anana whose planning took 23 years. According to an estimate by the Click at Nadlan website, a typical project takes 5 to 8 years from signing to keys. Anyone promising three years or less should show how.
What to check before signing
- A lawyer representing the tenants only. Not the developer's lawyer. It is customary for the developer to pay the fee, but the representation must be yours.
- An appraiser on the tenants' behalf. To check that the promised compensation is realistic on signing day, not just on paper.
- The list of signatories. Ask to see how many have actually signed a binding agreement.
- Guarantees. Make sure the agreement includes a Sale Law guarantee or an equivalent bank guarantee for the new apartment, in an amount reflecting its value, valid at least until Form 4 (the occupancy permit).
- Alternative housing. The monthly rent amount, indexation, and a period that also covers delays.
- Milestones with penalties. Permit, demolition, frame, Form 4 – each with a date and a sanction.
- The developer's and contractor's strength. The companies registry, open lawsuits, financial statements if the company is public, and the identity of the building contractor.
- Specifications. Area in square meters, balcony, parking, storage room and a binding technical specification.
- Taxation. The law includes exemptions from betterment tax and purchase tax in urban renewal deals, subject to conditions. Ask the lawyer to confirm in writing how they apply to you.
- Red flags: pressure to sign "this week," a clause waiving future claims, and overly optimistic timelines.
What to expect in legislation
In May 2026, a proposal to lower the required pinui-binui majority to 51% of owners passed a first reading as part of the Arrangements Law. Its fate in the current Knesset is unknown at the time of writing. In its June 2026 report, the State Comptroller repeated the call for a national urban renewal policy document.
Glossary
- TAMA 38: a national outline plan for strengthening buildings against earthquakes, which expired in May 2026.
- 38/1: strengthening the existing building and adding floors and safe rooms.
- 38/2: demolishing the building and rebuilding it on the plot.
- Pinui-binui: demolishing a complex of buildings and rebuilding it at high density under a detailed plan.
- Building renewal: municipal tracks for renewing a single building, replacing TAMA 38 in cities that approved a plan.
- Shaked alternative: a statutory track in which the permit and the plan are advanced together, as a substitute for TAMA 38.
- Holdout tenant: an owner who refuses to join the deal after the required majority has been reached.
- Betterment levy: a payment to the local authority for an increase in value resulting from a new plan.
- Form 4: the occupancy permit for the new building. The most important target date in the agreement.
- Sale Law guarantee: a guarantee that secures your money or your right to the new apartment if the developer fails to meet its obligations.
Frequently asked questions
I signed a TAMA 38 deal before May 2026. Is the agreement void? Not necessarily. The question is whether a permit application was filed before the expiry and what stage it is at. If not, the project may move to another track and a new agreement may be needed.
My building is small. Do I have a chance at pinui-binui? A pinui-binui complex requires at least 24 apartments. A small building can be included in a complex with neighboring buildings, or wait for a municipal building renewal plan.
What is the difference between pinui-binui and the replacement plan? Pinui-binui is based on a detailed plan for a complex, usually a large one. The replacement plan allows a single building to be renewed under fixed municipal rules, similar to TAMA 38.
Who pays the tenants' lawyer? Usually the developer, but this is set in the agreement. Make sure the lawyer is independent of the developer.
When will my refusal be considered reasonable? For example, when there is no alternative housing, no security, compensation lower than the neighbors', or a disability without a solution. The decision in each case rests with the Superintendent or the court.
This guide is general information and not legal, appraisal or tax advice.
Disclosure: ESH27, the publisher of 27news, operates in renovation and urban renewal.
27news Editorial · Editor: Ariel
Translated from the Hebrew original with the assistance of AI.
Sources
- מרכז הנדל"ן – תמ"א 38 פקעה סופית, וברוב הערים אין לה מחליפה (10.6.2026)
- מרכז הנדל"ן – ארבע שנים לחלופת שקד (9.11.2026)
- פישר (FBC) – עדכון התחדשות עירונית בחוק ההסדרים (נובמבר 2021)
- מרכז הנדל"ן – דייר סרבן, המדריך לשנת 2026
- ביזפורטל – הצעת החוק להורדת סף ההסכמה ל-51% (30.5.2026)
- מרכז הנדל"ן – דוח הרשות להתחדשות עירונית ל-2025 (31.5.2026)
- מבקר המדינה – תקציר דוח תכנון וקידום התחדשות עירונית ברשויות המקומיות (יוני 2026)
- קליק את נדל"ן – ארבע בדיקות לפני חתימה על פינוי-בינוי (2026)
In this story
Report an error
This story was written with AI assistance and fact-checked. Editor: Ariel. Publishing & oversight policy