ESH27 News – technology, the physical world, society and government
Construction, Real Estate & Settlement · Wing B – The Physical World

Record revenue, shrinking profit: Aura and Danya Cebus results show how little is left from building apartments in Israel

Aura's revenue rose 68% as profit fell 41%; Danya Cebus earned almost nothing on housing. What it means for buyers and owners

Published: · 5 min read

This story was written with AI assistance, based on the sources linked at the end, and fact-checked. Responsible editor: אריאל סיבקוב. Found an error? Tell us.

Translated from the Hebrew original with the assistance of AI. Read the Hebrew original

Two of Israel's large construction companies published their third-quarter 2026 results on November 18, and the picture is strikingly similar: revenue is at a record, but the profit left from each apartment is shrinking. Aura Investments, one of the prominent developers in urban renewal, reported quarterly revenue of about NIS 1.02 billion, up roughly 68%, while net profit fell about 41% to around NIS 55 million. At building contractor Danya Cebus, revenue climbed to about NIS 1.85 billion, yet residential construction left almost no profit.

Aura: more revenue, less profit per apartment

According to the reports, as covered by Globes, Bizportal and Merkaz HaNadlan, Aura's gross profit for the quarter fell to about NIS 147 million from about NIS 158 million a year earlier, and its gross margin dropped from about 26% to about 14%. Most of the erosion is in the apartment sales themselves: according to Globes, the gross margin on selling apartments to new buyers fell to 6.6% in the quarter, compared with 17.6% in the same quarter last year (as restated). Most of the company's gross profit, about 63%, came from construction services, meaning the new apartments it builds for the existing owners in its projects.

The pace of sales also slowed. In the first nine months of the year the company sold 722 apartments, compared with about 800 in the same period last year, and according to Merkaz HaNadlan it reached 854 apartments year to date including sales made after the end of September. According to Bizportal, about 80% of the apartments sold in the quarter were sold through a company financing promotion. Debt grew at the same time: Bizportal reports that total debt rose to about NIS 4.4 billion, compared with about NIS 3.3 billion at the end of 2025. For the first nine months of the year, Aura's net profit totaled about NIS 172 million, down about 32% from the same period.

On the other hand, the company points to expected gross profit of about NIS 5 billion in its active projects, and according to Merkaz HaNadlan about NIS 4 billion of that is expected to be recognized between 2027 and 2030. In other words, much of the profit is still ahead, and it depends on construction costs and selling prices in the coming years.

Danya Cebus: a NIS 24 billion backlog, a razor-thin residential margin

Danya Cebus is a building contractor: it builds for developers and other clients rather than selling apartments itself. Its quarterly revenue rose about 15% to about NIS 1.85 billion, but net profit fell about 27% to roughly NIS 30 million. Its overall gross margin declined from 4.4% to about 3%. For the first nine months of the year, revenue reached about NIS 5.1 billion, up about 3.6%, and net profit about NIS 106 million, down about 15%.

The standout figure is in housing. According to Merkaz HaNadlan, revenue from residential construction jumped 37% to about NIS 773 million, but gross profit in the segment fell to only about NIS 3 million, compared with about NIS 19 million a year earlier, and segment profit before tax came to about NIS 175,000. The quarter was rescued by infrastructure and concessions, where gross profit rose to about NIS 35 million from only about NIS 1.3 million a year earlier.

The company's order backlog stands at about NIS 24 billion, roughly half of it in residential construction. The board approved a NIS 30 million dividend. According to ice, the stock fell about 9% in morning trading after the results were released.

The Israel Securities Authority's new rules

Part of the change is an accounting one. In July 2025 the Israel Securities Authority published a staff position requiring urban renewal companies to separate, in their financial statements, the revenue and costs of selling apartments to new buyers from the construction services provided to existing owners, and to measure the value of the land received from residents in a uniform way. Aura, for example, has applied the position since its year-end 2025 statements, which is why last year's figures were restated.

In October 2026 the authority added a disclosure guide for prospectuses that asks, among other things, for details of buyer financing promotions and of completed apartments that remain unsold. According to Globes, the authority stresses that these are not binding uniform instructions. The paper reported on November 18 that the Tel Aviv Stock Exchange developers index fell almost 4% in the previous trading session, and that shares of several urban renewal companies fell more sharply, against the background of the new separation in the reports and concern over project profitability.

What it means for buyers and apartment owners

The results are consistent with September data published by the Finance Ministry's chief economist: net cash flow of only NIS 338 million to developers after paying suppliers, and 45% of new apartments sold on the open market carrying a financing benefit. When a developer's margin narrows, it has less room to cut prices, but it also becomes more dependent on sales and promotions to keep cash flowing.

For a buyer of a new apartment, this means it is worth checking the developer's financial strength and the guarantee it provides under Israel's Sale (Apartments) Law, and understanding what happens if a financing promotion ends before delivery. For owners in an urban renewal project, lower developer profitability may slow marginal projects and make it harder to negotiate generous compensation packages. Then again, the companies point to large backlogs and expected profits in the coming years. The question is how much of that will remain if construction costs keep rising.

Report an error

Spotted a factual error, a wrong quote or a broken link? Tell us. Every report is reviewed.

You are not legally required to provide these details. Fields marked * are needed to handle your request; without them we cannot reply. Purpose: to check the error report and update you. Database controller: אריאל סיבקוב (27news), news@esh27.com. Details are not shared with others, except infrastructure providers that store them for us (Cloudflare). You may access and ask to correct your data (sections 13–14 of Israel’s Privacy Protection Law). More: privacy policy.

This story was written with AI assistance and fact-checked. Editor: Ariel. Publishing & oversight policy

More in Construction, Real Estate & SettlementWhole desk →

Offices to homes by the metro: Israel's conversion committee deposits plan for 400 apartments in Givat Shmuel

The Metropark plan would turn an office site at the Coca-Cola junction into two 32-storey towers with 400 apartments, half of them small. The city objects.

23 November 2026

Sde Dov: Luzon Ronson sold more apartments than ever in Q3, but smaller and cheaper per square meter

Luzon Ronson signed 16 contracts at its Sde Dov project in Q3 at about NIS 64,000 per sqm. What is behind the drop, and where the soil contamination stands

23 November 2026

Record collapses in Israeli construction: about 815 building and infrastructure firms failed in 2026, and listed builders' profitability was cut by more than half

CofaceBDi survey: about 815 Israeli construction and infrastructure firms collapsed in 2026, 85% more than in 2022. 93% of contractors report higher costs.

23 November 2026

Israel's construction input index rose 3.9% in a year, but builders talk of 20%: what it means for off-plan buyers

Construction wages rose 5.3% a year, oil jumped 45% and contractors report costs 20% above pre-war levels. What it means for buyers, builders and tenders

23 November 2026